Office Complex Refurbishment, Canary Wharf
Complete transformation of a 20,000 sq ft office complex in London’s premier business district, creating a modern, flexible workspace that promotes collaboration and employee wellbeing.
Project Overview
This comprehensive refurbishment project involved the complete redesign and modernization of a three-floor office building in Canary Wharf. The project was delivered while the building remained partially occupied, requiring careful planning and minimal disruption to business operations.
Key Features
Workspace Design
- Open-plan work areas with flexible desk arrangements
- Collaborative zones with informal meeting spaces
- Quiet rooms for focused work and private calls
- Wellness room with meditation and relaxation facilities
- Client reception area with modern reception desk and waiting lounge
Technical Infrastructure
- Advanced HVAC system with zone control and air purification
- LED lighting with automated daylight harvesting
- High-speed data cabling throughout the building
- Video conferencing facilities in all meeting rooms
- Smart building management system for energy efficiency
Sustainability Features
- Energy-efficient glass reducing solar gain by 40%
- Motion sensor lighting in common areas
- Water-saving fixtures reducing consumption by 30%
- Recycling facilities integrated into workspace design
- Green walls in reception and common areas
Construction Details
Scope of Works
- Structural modifications to create open-plan layouts
- Complete MEP (Mechanical, Electrical, Plumbing) upgrade
- New partition walls with acoustic insulation
- Modern toilet facilities on each floor
- New kitchen and breakout areas on each floor
- Exterior facade cleaning and repair
Materials & Finishes
- Flooring: Commercial grade carpet tiles and polished concrete
- Walls: Acoustic panels with integrated whiteboard surfaces
- Ceilings: Suspended ceilings with integrated services
- Doors: Frameless glass partitions with privacy film
- Furniture: Ergonomic workstations and collaborative furniture
Sustainability Achievements
- Energy Consumption: Reduced by 35% compared to pre-refurbishment
- Water Usage: Decreased by 30% through efficient fixtures
- Waste Management: 95% of construction waste recycled
- Indoor Air Quality: Improved air filtration systems versus baseline
- Natural Light: Maximized through intelligent layout design.
Client Testimonial
“Blueprint Builders delivered an outstanding refurbishment project on time and within budget. Their attention to detail and ability to work around our operational requirements was exceptional. The new office space has significantly improved employee satisfaction and productivity.”
— Facilities Director, Corporate Client
Timeline
| Phase | Duration | Completion |
|---|---|---|
| Design & Approvals | 1.5 months | August 2023 |
| Strip-out Works | 1 month | September 2023 |
| Services Installation | 2 months | November 2023 |
| Partition & Finishes | 1.5 months | December 2023 |
| Furniture Installation | 1 month | January 2024 |
| Snagging & Handover | 1 month | February 2024 |