Project Overview

Located in the heart of Surrey, this 4-bedroom, 3-bathroom residence was designed to provide the perfect balance between open-plan family living and private retreat spaces. The property spans 2,800 sq ft across two floors, with additional outdoor living areas.

Key Features

Interior Design

  • Open-plan living area with 20ft ceilings and floor-to-ceiling windows
  • Gourmet kitchen with integrated appliances and island seating
  • Master suite with walk-in wardrobe and en-suite bathroom
  • Home office with dedicated workspace and storage solutions
  • Smart home technology integrated throughout

Sustainable Features

  • Solar panels generating 40% of household energy
  • Rainwater harvesting system for garden irrigation
  • High-efficiency insulation reducing energy costs by 30%
  • Air source heat pump for heating and hot water
  • Electric vehicle charging point in garage

Outdoor Spaces

  • Landscaped garden with native planting and wildlife areas
  • Outdoor kitchen and dining area for entertaining
  • Children’s play area with safety surfacing
  • Double garage with additional storage

Construction Details

Materials Used

  • Exterior: Brick cladding with cedar wood accents
  • Windows: Triple-glazed aluminum frames
  • Roofing: Sustainable composite tiles
  • Flooring: Engineered oak throughout ground floor
  • Kitchen: Quartz countertops with custom cabinetry

Technical Specifications

  • Foundations: Reinforced concrete raft foundation
  • Structure: Timber frame with steel reinforcements
  • Insulation: U-value of 0.15 W/m²K
  • Heating: Underfloor heating throughout
  • Ventilation: Mechanical heat recovery system (MVHR)

Client Testimonial

“Blueprint Builders exceeded all our expectations. They took our vision and transformed it into a home that’s more beautiful than we could have imagined. Their attention to detail and commitment to sustainability was impressive throughout the project.”

— The Thompson Family

Timeline

Phase Duration Completion
Design & Planning 3 months June 2023
Groundworks 1 month July 2023
Structure 2 months September 2023
First Fix 2 months November 2023
Second Fix 1.5 months December 2023
Finishing 1.5 months March 2024